8 Weeks Down! Getting there...
Kitchen - looking out onto the lounge. A plasma will be installed above the fireplace, hence the piping - which will be sealed soon. The idea is to have a wireless look. Hopefully the extractor, which will hang from the kitchen ceiling, roughly in line with the lamp in the lounge (which has since been removed, and replaced with spots), will not block the view too much.
Kitchen installation begins! Monday 7 Aug has been the most hectic day since we started bashing down the walls - the builders, electricians, kitchen installers and tilers arrived simultaneously! The kitchen units still require granite measurements, which will take another 3-4 days, so I don't imagine the kitchen will be ready to cook food until next week Friday - the 19th Aug.